Get Adobe Flash player
Slideshow
free counters

How we build

This post is also available in: esEspañol

First of all, we proudly can assure you that we build very fast, at the best quality on the market.

[Not a valid template]

For example, an 8 x 4 m Swimming pool we’ll have it finished in 15 days!

In the Pictures Gallery below, we show you how we build the gunite concrete swimming pools.
We’ll detail for you the process, because we want you to understand why we are the best in the fiels in Costa Blanca area.

  1. After the excavation, according to the measures of the pool depth is compacted and leveled the bottom (floor) with gravel.
  2. Build the ceramic brick  wall, which will show the outline of the future pool.
  3. Fitting a double metal mesh and steel bars that form a perimeter containment belt.
  4. Fitting of accessories such as skimmers, access ports, drain and underwater spotlights.
  5. Concrete spray “GUNITE” via wet concrete in several layers, pumped at high pressure and with a thickness of the walls 15cm. and 20 cm. the bottom, the speed this process allows finishing on the same day. That makes that the structure of the pool hardens in one piece.
  6. Fitting the piping for skimmers, hoover and bottom drain.
  7. Repairing of the mould for the coronation.
  8. Tiling the pool walls and floor with the chosen mosaic colour and grout.
  9. Installing the pump house.
  10. Moulding the coronation on site to follow the exact shape of the walls.
  11. After the period required for drying the concrete, the filling and testing the pump unit and pool, to ensure the absence of any possible leak.
Below we Detail the whole process of our way to Build Swimming pools, with an 8 x 4 “Romas Steps” Swimming Pool:

Details of the process for an 8 x 4 m Swimming Pool with “Roman Steps”:

Swimming pool Roman Steps· Digging the hole – customer charged per hour;
· Build walls for Swimming Pool;
· Fit Iron mesh;
· Fit iron bars;
· Spray (“Gunite”) the walls 15cm and 20cm the bottom;
· Build brick Steps;
· Fit 2 skimmers;
· Fit 3 water jets;
· Fit 1 hoover connector;
· Fit 1 water drain (bottom pool);
· Mould 40-50cm curved white pool edging;
· Finish with ceramic blue tiles and Greek “white-blue” border;
· Connect one pool light 100W x 12V;
· Fit pump house for pool( fiber glass) 1 m x 1 m;
· Connect electrics and pipes from pool to pump house – 5m;
· Connect Electric Box with timer and separate light switch;
· Totally finished!

Please fill up the form on Contact Us page, and we would be happy to quote the best price for your needs and assist you in realising your dream pool.