Get Adobe Flash player
Slideshow
free counters

Posts Tagged ‘future pool’

How we build

First of all, we proudly can assure you that we build very fast, at the best quality on the market.

[Not a valid template]

For example, an 8 x 4 m Swimming pool we’ll have it finished in 15 days!

In the Pictures Gallery below, we show you how we build the gunite concrete swimming pools.
We’ll detail for you the process, because we want you to understand why we are the best in the fiels in Costa Blanca area.

  1. After the excavation, according to the measures of the pool depth is compacted and leveled the bottom (floor) with gravel.
  2. Build the ceramic brick  wall, which will show the outline of the future pool.
  3. Fitting a double metal mesh and steel bars that form a perimeter containment belt.
  4. Fitting of accessories such as skimmers, access ports, drain and underwater spotlights.
  5. Concrete spray “GUNITE” via wet concrete in several layers, pumped at high pressure and with a thickness of the walls 15cm. and 20 cm. the bottom, the speed this process allows finishing on the same day. That makes that the structure of the pool hardens in one piece.
  6. Fitting the piping for skimmers, hoover and bottom drain.
  7. Repairing of the mould for the coronation.
  8. Tiling the pool walls and floor with the chosen mosaic colour and grout.
  9. Read the rest of this entry »